Monday, April 27, 2009

The Upper Level

We received the results back from our inspection. Not 'too' many things needed fixing, but a couple were things that really need to happen prior to us moving in. Fortunately, the bank from which we're purchasing this home from is going to fix them all! Yay!!!

Here's a photo tour of the 2nd level of our new home. It host all 4 bedrooms and 2 full baths.



Below is a picture of what you see when you get to the top of the stairs. To the left are bedrooms, and straight ahead is the hall bathroom.


Below is looking to the right. That looks into the master bedroom.

And this picture is looking back down the hall towards my NEW Scrapbook Room!!! Is it bad that I've already got this entire room planned out? I don't even know what we're doing in the rest of the house, but the scraproom is set! :)


Here's a picture of the scraproom. It has a great window. I'll be so glad to not be in the basement anymore.


Here's a picture of the master. The right door is into the bathroom, the left into the walk-in closet.


Here's the masterbath. We do have plans for re-doing this room. We'll post plans when we're ready to do this.


Here's looking into the hall bathroom. It's not too bad the way it is. We'll be doing a couple of changes here, but not many.


Here's looking into one of the other bedrooms. Probably just carpet and a coat of paint here.

And here's the last bedroom. Same as the other - carpet and paint. This view is looking back out into the hallway.

And that's it for tonight. I'll post more of the basement, laundry and garage another day. :)

0 comments: